NTPC Talcher ESP

Renovation and Retrofitting of ESP, Stage-II (4x500 MW)

Talcher, Odhisa

NTPC Limited

Under Progress

Design, Manufacture, Supply, Erection, Commissioning and PG Test of the ESPs including:

  • New parallel pass including internals and ducting,new structure and casing.
  • EPIC III controllers, TR sets, cables and switchgears.
  • Additional Control Rooms for Unit4, 5 & 6.
  • Dry ash handling system for new pass and hook up with existing pass.
  • EPIC III controllers of existing passes.

Post Retrofit /R & M Benefits

Stack emission levels to be reduced.

State of art EPIC III Controllers to be installed – Auxiliary power to be reduced.

Life extension of the ESP.