Vedanta Limited Chhattisgarh Thermal Power Plant

Client
Client
Vedanta
Location
Location
Jharsuguda, Odisha
Duration
Duration
-
Status
Status
Under Progress

Project Brief

  • NTPC GE supports Athena power assets through engineering solutions focused on performance and environmental compliance.
  • Plant systems are modernized for efficiency.
  • Emission mitigation technologies are deployed.
  • Control and monitoring systems enhance reliability.
  • Operational safety is ensured. Sustainability objectives are addressed.
  • Regulatory requirements are met.
  • Long-term asset performance is improved.
  • Stable operations are achieved.

Operation & Maintenance (O&M)

Ongoing Operation & Maintenance (O&M) services for the VLCTPP 2 × 600 MW Thermal Power Plant, covering end-to-end plant operations and maintenance across BTG, CHP, AHP, and all Balance of Plant (BoP) systems. The scope includes round-the-clock plant operation, preventive and condition-based maintenance, and performance optimization to ensure high availability, operational reliability, and statutory compliance. The O&M program focuses on stable unit operation, optimized heat rate, reduced forced outages, and safe, efficient power generation in line with contractual and regulatory requirements.