CSPGCL

Interconnection For Auxiliary Steam Piping Between 4X210MW AND1X1500MW

Korba, Chattisgarh

CSPGCL

Completed


Design, Engineering, Supply, Erection,Testing & Commissioning of Interconnection forAuxiliary Steam Piping Between 4x210 MW units and1x500 MW unit at HTPS, Korba West.

Hasdeo Thermal Power Station (HTPS), Korba West Plant. It is located attown Korba, Pin-495677(Distt-Korba-CG). Power station is at a distance of 10 Kms fromKorba Railway Station, which lies on Bilaspur-Champa-GeveraRoad Section ofS.E.Railway.

Overview Of Project

• Design, Engineering, Manufacturing, supply, installation and Commissioning of Interconnection for Auxiliary Steam piping between 4X210 MW Units and 1×500 MW Unit of HTPS, Korba West.
• Installation of Interconnection for Auxiliary Steam piping between 4X210MW Units and 1×500 MW Unit of HTPS, Korba West along with control valves,Isolation valves, NRV etc with bypass arrangement for de-super heater, where steam will beextracted from Main steam line after reducing pressure & spray water will be tapped fromBFP discharge line of unit 3&4.
• Interconnection shall consist of necessary piping, insulation & cladding,support etc. The system shall be provided with electrically operated valves which can beoperated from the remote.
• Arrange all the inspections including IBR inspection and approval by Chief inspector ofBoilers ( C.G.)
• Stress analysis of interconnecting piping is to be done to identify the support location.
• Pipeline erection work for tapping from Boiler Auxiliary steam station of Unit 3 &4just after the Pressure reducing valve but before desuperheater.
• Desuperhaters erection at Boiler Auxiliary steam station of Unit 3 &4.
• Necessary Civil Foundation work, Steel support structures for interconnecting auxiliary steam line.
• RCC Open/combine foundation with pedestal up to base plate level.