GSECL Ukai ESP

Retrofitting of ESP of Unit 3 & 4 (2x200 MW)

Ukai, Gujarat

Gujarat State Electricity Corporation Limited

Under Progress

R & M of ESP 2x200 MW Units

  • Increased Collection Area:
    • Height of Collecting Electrodes increased from 9 to 15 meter
    • Additional field at out of ESP
  • Advanced EPIC –III controllers and TR Sets
  • Retrofitting of Existing LT panels

Post Retrofit /R & M Benefits

ESP Emission to be reduced.

Corona Power to be reduced.

Pressure drop and Air leakage to be reduced from original levels